Today was the day the house became more than just an idea. We got the chance to walk around in it and explore the space. Our building rep went over where all the switches would be, as well as the rough-ins for ceiling fans. Turns out we will have attic space as well. We also noticed a small mistake but turned out to be a good one. Our tv connection was placed on the wrong wall from what we originally wanted. But after looking it over, we actually preferred the location they used (which is what 80% of the homes choose for their tv connection). We asked a lot of questions and they were very helpful. As far as the exterior of the house goes, we got a definite answer to how it will look (more siding than brick). The weather hasn't been the greatest this week so they haven't been able to start siding yet. But we're still on track for a late December close.
![]() |
| Looking down hallway from master bedroom. You'll see some wet spots on the floors from the recent rains. They're using propane heaters to dry it all out. |
![]() |
| Our new shower next to closet |
![]() |
| Windows in the master bedroom |
![]() |
| Bedroom 2 |
![]() |
| Bedroom 3 |
![]() |
| Looking from living room to kitchen |
![]() |
| In kitchen, looking out at doors to deck |
![]() |
| The kitchen |
![]() |
| View from kitchen where deck will be. Construction on the lots across from us will begin in December. |
![]() |
| Living room. You can see a couple of the LED light receptacles in the ceiling. |
![]() |
| Living room. Powder room was originally in corner |
![]() |
| Dining room |
![]() |
| Study. We were surprised the fuse box would be in here. You can see 2 LED light receptacles as well as one for a ceiling fan. |
![]() |
| Stairs from basement to first floor. The machine room housing the HVAC system is also visible. |
![]() |
| Looking up at first floor from basement |
![]() |
| Our front door view |
![]() |
| The radon mitigation system in the garage. |
![]() |
| Siding should start soon |